What You Provide:
- 3D CAD files (STEP, IGES, SolidWorks, etc.)
- Part specifications and requirements
- Expected annual volume
- Material preferences
- Quality and tolerance requirements
A proven, step-by-step approach to offshore tooling that eliminates risk and ensures quality at every stage.
Timeline: 1–3 business days
Timeline: 1-2 weeks
Timeline: 6-12 weeks (depends on complexity)
Timeline: 2-4 weeks
Timeline: 2-4 weeks for shipping + setup
You’re never left in the dark
Progress reports with
photos and status on every active project. No
surprises, no guessing.
If a problem arises, we notify you immediately with solutions and options. Fast decision-making keeps projects on track.
One dedicated USA-based engineer manages your project. Call or email anytime during business hours.
The biggest risk with offshore tooling is receiving a tool that doesn’t work. We eliminate that risk with proven sampling before shipment.
No build starts until you’ve reviewed and approved the tool design drawings.
We verify critical dimensions on the tool before first shot.
Progressive sampling and qualification-parts are tested and shipped to you for approval.
Tool doesn’t ship until you’ve approved T2 production samples.